Nifty 50
- Cipla₹1,39916.00 (1.16%)
- Bajaj Finance₹982-61.20 (-5.87%)
- NTPC₹326.200.20 (0.06%)
- HDFC Life Insurance ₹529.25-32.25 (-5.74%)
- Bajaj Finserv₹1,766.50-80.00 (-4.33%)
- Axis Bank₹1,192.40-50.80 (-4.09%)
- Adani Enterprises₹2,905.60-87.60 (-2.93%)
- InterGlobe Aviation₹4,899-129.50 (-2.58%)
- Nestle₹1,352-35.20 (-2.54%)
- Asian Paints₹2,396-59.00 (-2.40%)
- Hindalco Industries₹979.70-24.10 (-2.40%)
- Trent₹2,710-64.00 (-2.31%)
- Offerings
- Tools & Platforms
Tools & Calculators
- Open API
- Calculators
- SIP Calculator
- CAGR Calculator
- Compound Interest Calculator
- FD Calculator
- RD Calculator
- EPF Calculator
- Retirement Calculator
- HDFC SIP Calculator
- Mutual Fund Return Calculator
- Lumpsum Calculator
- Step Up SIP Calculator
- ETF SIP Calculator
- Brokerage Calculator
- Equity Margin Calculator
- SWP Calculator
- EMI Calculator
- MTF Calculator
- Margin Pledge Calculator
- Algo Strategy
- Markets
Stocks
F&O
Mutual Funds
- More
Open Free Demat Account
Open Free Demat Account
Twamev Construction Share Price Today
As of 24-09-2026 15:43, Twamev Construction and Infrastructure Ltd. share price today is ₹0, with a change of ₹-5.83 (-100.00%) from the previous close of ₹5.83. The stock opened at ₹6.12 and traded between ₹6.12 and ₹6.12, with a total traded volume of 1221318 shares. The company has a market capitalization of ₹86.2 Cr in the Cement and Construction sector. while its 52-week high and low are ₹33.99 and ₹5.33, respectively.
Twamev Construction and Infrastructure Ltd. valuation metrics include a P/E ratio of 12.2, EPS of ₹0.5, and book value of ₹0.30. Profitability indicators show ROE of 2.45%. Twamev Construction and Infrastructure Ltd. has reported revenue of ₹66.75 Cr and net profit of ₹7.08 Cr.
Twamev Construction and Infrastructure Ltd. technical indicators include Day RSI at 11.77, Day MFI at 2.67, Day ADX at 51.71. Additional indicators include Commodity Channel Index (CCI) at -134.1 and Williams %R at -97.9. Momentum indicators show Day MACD at -1.1, Day MACD Signal Line at -0.95, DayATR at 0.48. Rate of Change indicators for Twamev Construction and Infrastructure Ltd. include ROC125 at -77.8 and ROC21 at -41.54.
Exponential moving averages include EMA5 at ₹6, EMA10 at ₹6.5, EMA12 at ₹6.7, EMA20 at ₹7.4, EMA26 at ₹7.8, EMA50 at ₹9.7, EMA100 at ₹13.2, EMA200 at ₹17.9. Simple moving averages include SMA5 at ₹5.9, SMA10 at ₹6.6, SMA20 at ₹7.7, SMA30 at ₹8.3, SMA50 at ₹9, SMA100 at ₹14.5, SMA150 at ₹17.6, SMA200 at ₹19.2.
Support levels for Twamev Construction are placed at First Support ₹5.42, Second Support ₹5.27, Third Support ₹5.05. Resistance levels are seen at First Resistance ₹5.79, Second Resistance ₹6.01, Third Resistance ₹6.16. Twamev Construction and Infrastructure Ltd. shareholding pattern shows promoter holding at 83.05%, FII holding at 0.1%, DII holding at 0%, public holding at 16.85%.
Twamev Construction Performance
Price Movement
₹6.12
₹6.12
1 Year Performance
₹5.33
₹33.99
Markets Today
Historical Performance
Twamev Construction Fundamentals
Twamev Construction Financials
Indicator | Jun 2026 | Mar 2026 | Dec 2025 | Sep 2025 | Jun 2025 |
|---|---|---|---|---|---|
| Total Revenue | 11.04 | 22.51 | 20.83 | 12.37 | 11.74 |
| Operating Expense | 10.02 | 20.39 | 18.77 | 8.18 | 10.79 |
| Operating Profit | 1.02 | 2.12 | 2.06 | 4.19 | 0.95 |
| Depreciation | 0.28 | 0.31 | 0.32 | 0.34 | 0.37 |
| Interest | 0.23 | 0.22 | 0.14 | 0.22 | 0.15 |
| Tax | 0 | -0.04 | 0 | 0 | 0 |
| Net Profit | 0.74 | 1.91 | 1.79 | 4.06 | 1.34 |
Twamev Construction Technicals
Twamev Construction and Infrastructure Ltd. EMA & SMA
₹6.12
↗ Bullish Moving Average
0
↘ Bearish Moving Average
16
Twamev Construction Support and Resistance
Resistance
Support
Technical Indicators
Twamev Construction Shareholding Pattern
| Held By | Mar 2025 | Jun 2025 | Sep 2025 | Dec 2025 | Mar 2026 | Jun 2026 |
|---|---|---|---|---|---|---|
| Promoter | 94.3 | 89.4 | 85.1 | 84.5 | 84.1 | 83 |
| FII | 0 | 0 | 0 | 0 | 0 | 0.1 |
| DII | 0 | 0.2 | 0.1 | 0.4 | 0.1 | 0 |
| Public | 5.7 | 10.5 | 14.7 | 15.1 | 15.8 | 16.8 |
Twamev Construction Delivery And Volume
| Period | Combined Delivery Volume | NSE+BSE Traded Volume Avg | Daily Avg Delivery Volume % |
|---|---|---|---|
| Day | 3.59 L | 3.59 L | 100.00% |
| Week | 4.22 L | 4.22 L | 100.00% |
| 1 Month | 1.94 L | 1.94 L | 100.00% |
| 6 Month | 4.8 L | 9.62 L | 49.93% |
Twamev Construction SWOT Analysis
PEG lower than Industry PEG
Company able to generate Net Cash - Improving Net Cash Flow for last 2 years
Book Value per share Improving for last 2 years
Companies with Zero Promoter Pledge
Twamev Construction Corporate Action
Ex-Date | Dividend Amount | Dividend Type | Record Date | Instrument Type |
|---|---|---|---|---|
| 27 Sep, 2012 | 1.5 | FINAL | Equity Share | |
| 07 Sep, 2011 | 2.5 | FINAL | Equity Share | |
| 06 Sep, 2010 | 1.5 | FINAL | Equity Share | |
| 31 Aug, 2009 | 1.5 | FINAL | Equity Share | |
| 15 Sep, 2008 | 1.5 | FINAL | Equity Share | |
| 23 Aug, 2007 | 2 | FINAL | Equity Share | |
| 24 Aug, 2006 | 1 | FINAL | Equity Share |
Twamev Construction Stock Comparison
Financials | ||||||
|---|---|---|---|---|---|---|
| Price (₹) | ₹76.05 | ₹43.14 | ₹136.05 | ₹37.40 | ₹43.10 | ₹34.50 |
| % Change | -5.94% | -0.96% | 0.00% | -1.32% | -2.44% | 0.00% |
| Revenue TTM (₹ Cr) | - | ₹799.33 | - | - | ₹430.67 | - |
| Net Profit TTM (₹ Cr) | - | ₹25.87 | - | - | ₹25.34 | - |
| PE TTM | 10.00 | 12.00 | 6.80 | 5.30 | 10.30 | 6.90 |
| 1 Year Return | 54.7 | -50 | -0.62 | -39.84 | -41.83 | -40.08 |
| ROCE | - | 20.02 | - | - | 20.16 | - |
Similar Stocks
ARIS
Arisinfra Solutions Ltd.
₹ 141.44
-1.59%
SAMAY
Samay Project Services Ltd.
₹ 47.80
+0.00%
GARUDA
Garuda Construction and Engineering Ltd.
₹ 178.20
-3.40%
INTERARCH
Interarch Building Solutions Ltd.
₹ 1675.90
-1.02%
SRM
SRM Contractors Ltd.
₹ 419.30
-0.75%
VPRPL
Vishnu Prakash R Punglia Ltd.
₹ 33.06
+0.70%
PIGL
Power and Instrumentation (Gujarat) Ltd.
₹ 102.00
+2.08%
USK
Udayshivakumar Infra Ltd.
₹ 19.64
-1.06%
HARSHA
Harsha Engineers International Ltd.
₹ 458.90
-1.21%
MARKOLINES
Markolines Pavement Technologies Ltd.
₹ 167.21
-1.58%
LIKHITHA
Likhitha Infrastructure Ltd.
₹ 227.18
-0.89%
SWSOLAR
Sterling and Wilson Renewable Energy Ltd.
₹ 177.31
-1.91%
GENSOL
Gensol Engineering Ltd.
₹ 17.20
+2.56%
GAYAHWS
Gayatri Highways Ltd.
₹ 1.89
+0.53%
HGINFRA
HG Infra Engineering Ltd.
₹ 468.85
+4.03%
CAPACITE
Capacit'e Infraprojects Ltd.
₹ 193.20
-2.55%
BRNL
Bharat Road Network Ltd.
₹ 16.34
-1.92%
SALASAR
Salasar Techno Engineering Ltd.
₹ 4.92
-0.40%
PSPPROJECT
PSP Projects Ltd.
₹ 805.40
-3.26%
BIGBLOC
Bigbloc Construction Ltd.
₹ 40.87
+2.25%
SADBHIN
Sadbhav Infrastructure Project Ltd.
₹ 2.59
+0.00%
PNCINFRA
PNC Infratech Ltd.
₹ 136.80
-1.70%
MEP
MEP Infrastructure Developers Ltd.
₹ 0.65
+1.56%
ORIENTCEM
Orient Cement Ltd.
₹ 122.25
-2.11%
FAQ's on TICL
What is the current share price of Twamev Construction and Infrastructure Ltd.?
What is the Market Capitalization of Twamev Construction and Infrastructure Ltd.?
What are the PE and PB ratios for Twamev Construction and Infrastructure Ltd.?
What is the 52-Week High and Low for Twamev Construction and Infrastructure Ltd.?
Who are the major shareholders of Twamev Construction and Infrastructure Ltd.?
Who are the peers of Twamev Construction and Infrastructure Ltd. in the Cement and Construction sector?
What is the latest dividend information for Twamev Construction and Infrastructure Ltd.?
By signing up I certify terms, conditions & privacy policy

